Design phase work completed

  • sarkcommunitypower
  • Sep 3, 2024
  • 1 min read

Updated: Mar 14

Design stage work for the partial or complete replacement system has now been completed. The work was split into 2 packages. Infinite Renewables led the generation system design. Sancus working with design consultants Auora Power led the design of the distribution system.


For a summary of the outcome and to view the design phase reports please see the New System page.






 
 